B334 Repair Kitchen Flooring
FA3030 17 CONS CC
- Posted
- June 18, 2026
- Due
- July 20, 2026
Sam's bid workup
Everything you need to decide whether to bid — no need to open the original RFP.
Scope
This contract requires repair and replacement of kitchen flooring in Building 334 at Goodfellow Air Force Base, Texas, including demolition, floor preparation, application of new flooring, temporary partitions, site cleanup, and demobilization. A second line item covers the removal, temporary storage, sanitization, cleaning, and reinstallation of all kitchen equipment associated with the flooring work, with a total performance period of 164 calendar days.
Key dates
- Response deadline
- July 20, 2026
- Q&A deadline
- Not stated in this solicitation — double-check the source
- Site visit
- Not required
Money
- Estimated value
- Not stated in this solicitation — double-check the source
- Bid bond
- Not requiredA bid bond guarantees you'll sign the contract if you win. 'Not required' means you can bid without posting one — one less hurdle for a small shop.
- Performance bond
- Not stated in this solicitation — double-check the sourceA performance bond guarantees you'll finish the work to spec — commonly required after award on construction jobs.
- Payment bond
- Not stated in this solicitation — double-check the sourceA payment bond guarantees you'll pay your subcontractors and suppliers.
Insurance
| Coverage | Required limit |
|---|---|
| General Liability | Not specified |
| Workers Compensation | Not specified |
| Vehicle Insurance | Not specified |
Licenses & registrations
- Active SAM.gov registration
- Active CAGE code
- Valid driver's license (for personnel operating vehicles on Goodfellow AFB)
- Current vehicle registration (for vehicles operated on Goodfellow AFB)
Set-aside
Small Business set-aside
Reserved for small businesses — only firms under the SBA size standard for this work can bid; large companies are excluded.
Official designation: Total Small Business Set-Aside (FAR 19.5)
Check if you qualify →Top 3 disqualifiers
The things that actually get bids thrown out.
- 1Technically unacceptable proposal — failing to demonstrate manufacturing/supply chain capability, installation methodology, schedule management for the 164-day period, or technical compliance confirmation
- 2Late submission — proposals must be received by the due date/time (2026-07-20 14:00 UTC)
- 3Not eligible for the Total Small Business Set-Aside under NAICS 238330
Can you win this?
NAICS 238330 (Flooring Contractors) is the required code. Confirm your SAM.gov registration lists 238330 as a primary or secondary NAICS and that you meet the small business size standard for this code.
Use the toolThis is a Total Small Business Set-Aside under FAR 19.5. Confirm your business qualifies as a small business under NAICS 238330 before investing in a bid.
Use the toolThis is a federal SAM.gov solicitation. You must have an active SAM.gov registration with a current CAGE code on the bid date — renewals can take weeks, so check now.
No bid, performance, or payment bond requirements are explicitly stated in the solicitation documents. Verify the final solicitation package for any bond clauses before submitting.
The base access letter requires contractors operating vehicles on Goodfellow AFB to carry valid vehicle insurance. Specific dollar limits for general liability or workers' comp are not stated — confirm requirements in the final contract clauses.
Evaluation is LPTA. The technical volume requires a narrative demonstrating understanding of flooring demolition/installation, supply chain capability, schedule management for the 164-day period, and technical compliance. Have relevant flooring project references ready.
Use the toolDavis-Bacon Wage Determination TX20260282 applies (Irion and Tom Green Counties, TX, Building Construction). Key rates include: Tile Setter $14.74/hr, Tile Finisher $11.22/hr, Carpenter $13.82/hr, Laborer $9.74/hr. Paid sick leave (EO 13706) also applies. Certified payroll records will be required.
Use the toolNo site visit is mentioned in the solicitation documents. The base access letter template suggests contractors will need periodic access passes for Goodfellow AFB — plan for base access coordination after award.
Sources: Solicitation listing, Attachment+5+-+Base+Access+Letter+Template.pdf, Attachment+3+-+Wage+Determination.pdf, Section+M+-+Evaluation+Criteria+v1.pdf, Price+Schedule+-+Repair+Kitchen+Flooring+B334.pdf
Get free alerts for bids like this
New bids for your trade, every week — summarized in plain English by Sam.
We email you bid alerts — that's it. No spam, no selling your address. Unsubscribe anytime. Privacy Policy.