FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX

W7N2 USPFO ACTIVITY TXANG 147

Solicitation 4ff9049d62fb444c8e84994dcd58732e·SAM.gov

Posted
July 16, 2026
Due
July 24, 2026
NAICS238210

Sam's plain-English summary

The US Air Force is seeking bids to install a new 3-phase primary underground electrical service at Ellington Field in Texas. The deadline is July 24, 2026 at 9 PM Eastern time—this is a normal timeline, not unusually soon. The solicitation does not explicitly state bonding or insurance requirements in the provided information, though these are common for electrical work on federal military installations and should be verified. Bids typically get disqualified for: (1) failure to meet electrical licensing and safety certifications required for military installations, (2) inability to obtain site access clearance or pass security requirements at a military facility, (3) not meeting the specific technical specifications for 3-phase primary service installation, and (4) missing required documentation or submitting after the deadline. You should carefully review the full solicitation details on SAM.gov to confirm all bonding, insurance, and security clearance requirements before bidding. You likely qualify if: You are a licensed electrical contractor with experience installing commercial or industrial 3-phase underground electrical service, can obtain security clearance to work at a military installation, and have references for similar federal or municipal projects.

Sam's bid workup

Everything you need to decide whether to bid — no need to open the original RFP.

Scope

This project requires a contractor to replace the failed underground 3-phase primary electrical service between an existing tap box and transformer that supplies power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. Work includes directional boring of new 4-inch PVC conduit, furnishing and installing three new medium-voltage (12.47 kV / 15-kV class) primary cables, performing all terminations, comprehensive testing and commissioning, surface restoration, and providing as-built documentation — all within 60 days after Notice to Proceed.

Key dates

Response deadline
July 24, 2026

Unlock the full workup

You're seeing the scope and deadline. Founding members see everything else.

  • Money & bonds

    Estimated value, bid bond, performance and payment bonds.

  • Insurance

    Required coverages and limits — or the typical ones to expect.

  • Licenses & registrations

    Every license and registration you must hold to bid.

  • Set-aside

    Whether it's reserved for HUBZone, 8(a), WOSB, and more.

  • Top 3 disqualifiers

    The things that actually get bids thrown out.

  • Can-you-win checklist

    A go / no-go readiness gate before you spend a day on the bid.

  • Compliance matrix (founding members only)

    Every instruction your response must satisfy, mapped to how it's scored — with source quotes. Not included in free unlocks.

$49/mo — founding price, locked for life. 30-day money-back guarantee. Cancel anytime.

Free account: one email link — no password, no card required. Founding membership is $49/mo — cancel anytime.

Get free alerts for bids like this

New bids for your trade, every week — summarized in plain English by Sam.

We email you bid alerts — that's it. No spam, no selling your address. Unsubscribe anytime. Privacy Policy.

Documents