BidGovContracts
ConstructionMT

Replace Drain Field with Forced Septic Line

PBS R7 SERVICES AND FACILITIES MAINTENANCE

Solicitation 9975475169494e48883e757a22bfbc0a·SAM.gov

Posted
July 15, 2026
Due
July 30, 2026
NAICS238910

Sam's plain-English summary

The Public Buildings Service (PBS) in Region 7 is seeking bids to replace a drain field with a forced septic line system. This is a specialized plumbing/septic work project. The deadline is July 30, 2026 at 9:00 PM ET, which is several months away—not unusually tight. The solicitation does not explicitly mention bonding or insurance requirements in the provided details, though federal construction projects typically require performance and payment bonds (usually 100% of contract value) and general liability insurance. Bids most commonly get rejected for: (1) failing to meet technical specifications for septic system installation, (2) not providing required bonding/insurance documentation, (3) submitting incomplete or unsigned bids, (4) not being properly registered in SAM.gov, or (5) bidding above the government's internal cost estimate. You'll want to review the full solicitation on SAM.gov for specific bonding and insurance terms. You likely qualify if: You are a licensed plumbing or septic contractor with experience installing forced septic systems, you're registered in SAM.gov, you can obtain performance and payment bonds, and you carry general liability insurance. You likely qualify if you've completed similar government or commercial septic projects.

Sam's bid workup

Everything you need to decide whether to bid — no need to open the original RFP.

Scope

The U.S. General Services Administration (PBS Region 7) is soliciting proposals to replace the existing drain field with a Forced Septic Line to AX System at the Piegan Land Port of Entry Main Port Building in Babb, MT. The contractor must furnish all management, supervision, labor, materials, supplies, tools, equipment, and subcontracts necessary to complete the work within the property line of that location over a 90-day base period beginning on or about October 1, 2026.

Key dates

Response deadline
July 30, 2026

Unlock the full workup

You're seeing the scope and deadline. Founding members see everything else.

  • Money & bonds

    Estimated value, bid bond, performance and payment bonds.

  • Insurance

    Required coverages and limits — or the typical ones to expect.

  • Licenses & registrations

    Every license and registration you must hold to bid.

  • Set-aside

    Whether it's reserved for HUBZone, 8(a), WOSB, and more.

  • Top 3 disqualifiers

    The things that actually get bids thrown out.

  • Can-you-win checklist

    A go / no-go readiness gate before you spend a day on the bid.

  • Compliance matrix (founding members only)

    Every instruction your response must satisfy, mapped to how it's scored — with source quotes. Not included in free unlocks.

$49/mo — founding price, locked for life. 30-day money-back guarantee. Cancel anytime.

Free account: one email link — no password, no card required. Founding membership is $49/mo — cancel anytime.

Get free alerts for bids like this

New bids for your trade, every week — summarized in plain English by Sam.

We email you bid alerts — that's it. No spam, no selling your address. Unsubscribe anytime. Privacy Policy.